Archive for January, 2021

Home > Archive for January, 2021
50,000m Diamond Drilling Program and Large Surface EM Survey Underway at Eastmain
January 18, 2021

50,000m Diamond Drilling Program and Large Surface EM Survey Underway at Eastmain

HIGHLIGHTS First rig arrived on site on 13 January and is now drilling First target of 2021 drill season is the newly identified footwall conductors Numerous untested conductors from the 2020 EM campaign to be drilled in priority FLEM underway covering 3km of potential strike extent of two trends (main mine trend and new hangingwall […]

Electromagnetics Identify New Conductive Trend In Footwall Of Eastmain Mine
January 13, 2021

Electromagnetics Identify New Conductive Trend In Footwall Of Eastmain Mine

HIGHLIGHTS Re-processing of FLEM identified a large conductor in the footwall of the existing resource at A Zone (376,000oz at 7.9gpt gold) Last DHEM survey of historical hole in 2020 identified off-hole conductors 200m in the footwall of A Zone confirming FLEM modelled plate These conductors represent a potential 3rd trend to be tested in […]